距开幕还有0

长沙国际绿色智能建造与建筑工业化
博览会暨世界建造业大会

Changsha International Green Intelligent Construction and Building Industrialization Expo & World Construction Conference

时间:2024年11月7日-9日

地点:长沙国际会展中心

(地铁2号线/4号线,光达站)

China Railway Urban Construction Beijing Company: observation and learning



Prefabricated building refers to a building assembled from prefabricated parts and components on the site. It has the advantages of fast construction progress, energy saving and environmental protection, cost reduction and efficiency increase. In recent years, as the country vigorously promotes, the development of prefabricated buildings is an important measure to promote supply-side structural reforms and the development of new urbanization. It is a concrete manifestation of the implementation of green development concepts and innovative development concepts in the construction industry, and it is to promote the transformation and upgrading of the construction industry.

An important starting point for realizing the modernization of the construction industry is the only way for the development of the construction industry. In order to exchange prefabricated building construction experience, improve the company’s construction technology management level and technical strength, and meet the needs of the development of building industrialization, recently, China Railway Urban Construction Beijing Company organized technical backbones to Beijing Yugou Co., Ltd. Yushuzhuang relocation housing project for prefabricated architectural design -Engineering construction-on-site observation and learning of the integrated construction industry of PC manufacturing. The company’s deputy general manager Liu Yuwei, chief engineer Ren Zhaobing, the company’s first-level experts, the business backbone of relevant departments of the headquarters and the Beijing regional project department, a total of 43 people participated in the observation and learning.

The project adopts a prefabricated frame structure system, the interior and exterior walls use prefabricated fabricated wall panels, the bathroom and balcony partial floor slabs are cast in place, and the rest of the floor slabs are all prefabricated laminated floor slabs. In the site model display area, everyone first listened to a detailed introduction of the construction of the prefabricated building and had a preliminary understanding of the prefabricated frame structure system of the project. Then, under the leadership of the on-site technical person in charge, went to the construction site to observe the construction process of the prefabricated building. The observers took out their mobile phones to record the hoisting and installation of prefabricated wall panels, and the sleeve grouting process. At the same time, they communicated with the technical person in charge of the site on issues such as vertical component hoisting, correction, laminated board installation, number of installers, mechanical equipment selection, construction schedule, cost control, and difficulties in prefabricated construction. The observers then visited the Yugou Company’s pilot building and the new material display area. By watching various precast concrete components, prefabricated structural nodes, prefabricated system nodes, prefabricated building construction processes and completed products, they learned about the prefabricated building The entire construction process.

Through this observation and learning, the observers not only learned the experience of prefabricated construction, but also broadened their horizons and ideas. Everyone said that they would take this observation and learning activity as an opportunity to absorb the excellent practices of prefabricated construction in many ways, improve the company's construction technology management level and technical strength, and better meet the needs of future construction industrialization development, and contribute to the company's continuous Contribute to healthy development.